ANALISIS BEBAN KERJA DAN JUMLAH TENAGA KERJA OPTIMAL PADA DIVISI CABIN BASE MAINTENANCE (CBM) DENGAN PENDEKATAN FULL TIME EQUIVALENT (FTE)
ANALISIS BEBAN KERJA DAN JUMLAH TENAGA KERJA OPTIMAL PADA DIVISI CABIN BASE MAINTENANCE (CBM) DENGAN PENDEKATAN FULL TIME EQUIVALENT (FTE)
Abstract
- Batam Aero Technic is a company engaged in the field of aircraft maintenance which was founded in 2013 and serves airlines from the Lion Group. The current problem is the discrepancy between the actual completion time and the target completion time on the A320 C-Check 02 project. This research is to find out how the technician's workload is and how many technicians are needed for the project.
The analytical tool used for this study is the Full Time Equivalent method which is used to measure the time to complete work compared to the time available to complete the work. The objects studied were technicians on the C-Check 02 project A320 aircraft with a research sample of 4 people. For measurements carried out by direct observation of the technician working.
Based on the research results, it is known that the technician's workload is in the overload category. Therefore, to solve this problem, an additional number of technicians was carried out by 1 people. With the addition of 1 technician, the workload which was initially in the overload category is now in the normal category.
Downloads
ARTIKEL Download: 18